PGH Wong Engineering, Inc Home
PGH Wong Engineering, Inc. Home About Us Featured Projects Services Careers Contact Us
  San Francisco
Muni
Featured Projects
San Francisco BART Project
Valley Metro Rail (VMR) Project
FTA Project Management Oversight
San Diego MTDB Project
San Francisco Int'l Airport Project
San Francisco Muni Project
Salt Lake City UTA Project
Santa Clara VTA Project
Silicon Valley Rapid Transit (SVRT) Project
Sacramento LRT Project
Bi-State MetroLink Project
Miami Airport Project
San Francisco DPW Project
 
« Back to Muni Projects Listing
Muni Metro Turnback Project

Wong was responsible for systems design and construction management of the $120 million Muni Metro Turnback (MMT) LRT Project. The MMT extends Muni Metro Light Rail Transit Line underground approximately one mile from Embarcadero Station to a tunnel portal connecting to the Mission Bay surface line. The MMT Project includes 800 ft of bored tunnel, cut-and-cover structure, and an extensive underground turnback complex with two pocket tracks. The MMT improves turnback operations, reduces headways, and provides underground train storage, thus enabling Muni to significantly increase system capacity.

The MMT systems include traction power distribution and overhead contact system, gap breaker stations, train control, communications, and tunnel ventilation fans with associated electrical power distribution and control systems. A CCTV system enables monitoring of the tunnel portal and operations within the Turnback structure. The tunnel ventilation system consists of a new ventilation structure with three 450 hp fans, additional ventilation fans at Embarcadero Station, and a microprocessor-based fan control system.

An essential part of the Project is the installation of a new fiber optic communications backbone system extending 6 miles in existing underground tunnels from the MMT to Muni Central Control. Modifications at Central Control provide for monitoring and control of the MMT ventilation fans, communications, train control, and communications systems.

Location:
San Francisco, CA
Client:
Municipal Transportation Agency, City & County of San Francisco
Scope of Services:
  • Transit/Rail System Design
  • Construction Management
  • Inspection
  • Testing and Startup
  • Project Duration:
    1990 - 1994
    Total Installed Cost: $120 Million
    Significant Elements:
  • Underground Turnback Complex
  • Two Pocket Tracks
  • Interface to Existing Systems
  • Central Control Modifications
  • Ventilation Structure with 3-450 hp Fans